The Club have been carrying out some significant work on the Loddon this summer to improve accessibility between Herons Reach and the A4 on Loddon Drive.

A new 8 foot access gate was installed which allowed us to dig and level a much wider footpath along the entire stretch with a few new swims added for good measure. A couple of pinch points have been addressed and the entire path has now been reseeded.

A BIG Thank you to our volunteers and the contractor who operated the digger for making this happen. More work is planned during the winter to create a further 4 swims and some tree work is also required but its beginning to take shape and it will certainly look a much better venue next season.